Asymmetrical and Peak Fault Current from X/R

The first-cycle fault current the symmetrical value hides: a DC offset rides the AC wave, sized by the circuit X/R ratio. I_peak = sqrt(2) x I_sym x (1 + e^(-pi/(X/R))) and the asymmetrical RMS multiplier = sqrt(1 + 2 e^(-2 pi/(X/R))). At 20 kA symmetrical, X/R 15 (a stiff service near a large transformer) the first peak is 51.2 kA (2.56x) and the asymmetrical RMS 30.4 kA (1.52x) -- a bus braced only for 20 kA is badly under-rated; at X/R 5 the DC decays faster, so 43.4 kA peak and 25.1 kA RMS. A device's peak-withstand and bus bracing must survive the asymmetrical first-cycle, not the symmetrical RMS. A design aid; the interrupting-duty rating and coordination study govern.

Run the calculator

Formula and source

I_peak = sqrt(2) x I_sym x (1 + e^(-pi/(X/R))); MF_rms = sqrt(1 + 2 e^(-2 pi/(X/R))); I_asym = I_sym x MF_rms.

First-cycle fault-asymmetry model (DC offset from X/R), an IEEE C37 / NEMA AB-4 first-cycle relation, by name; the interrupting-duty rating and coordination study govern the applied duty.

Audience

This tile is built for electricians and the adjacent professions in the Electrical group. The interactive calculator runs entirely in your browser. No account, no fee, no advertising, no tracking.

Related tools

Posture

Rough Logic answers the math question the working professional asks on the job. The site is a calm, fast, ad-free, account-free, ever-free reference. It does not interpret code. It does not replace the licensed professional. It does not store your inputs. The Authority Having Jurisdiction governs all installations and inspections.