Backflow Assembly Test Pass Criteria

Pass/fail per assembly type with the governing field-test criterion: RP relief opens >= 2 psid below the #1 check and the #1 check >= 5 psid; DC each check >= 1 psid. Per the USC FCCCHR Manual and AWWA C511.

Run the calculator

Audience

This tile is built for water operators and the adjacent professions in the Water and Wastewater Operations group. The interactive calculator runs entirely in your browser. No account, no fee, no advertising, no tracking.

Related tiles

Posture

Rough Logic answers the math question the working professional asks on the job. The site is a calm, fast, ad-free, account-free, ever-free reference. It does not interpret code. It does not replace the licensed professional. It does not store your inputs. The Authority Having Jurisdiction governs all installations and inspections.