Backflow Assembly Test Pass Criteria

Pass/fail per assembly type with the governing field-test criterion.

Run the calculator

Example

You enter

You get

Details, formula, and sources

RP relief opens >= 2 psid below the #1 check and the #1 check >= 5 psid; DC each check >= 1 psid. Per the USC FCCCHR Manual and AWWA C511.

RP pass: #1 check >= 5 psid AND relief opens >= 2 psid below the #1 check. DC pass: each check holds >= 1 psid tight.

USC FCCCHR Manual of Cross-Connection Control and AWWA C511 field-test procedure, by name.

USC FCCCHR / AWWA published; the tester-procedure thresholds are public. The certified tester and water purveyor govern.

Estimate. Operator of record and primacy agency govern.

Field names used by the API: assembly_type, check1_psid, relief_open_psid, check2_psi, buffer_psid

Related tools