The closet build nothing counted: rod LF (double-hang walls take two), shelf LF (one per hang run plus the linen stack).

Run the calculator

Example

You enter

You get

No published worked example is on file for this calculation. It is checked against a hand-worked derivation of its method.

Details, formula, and sources

ScopeSticks and boards from stock length, and the support count that actually matters - brackets at each end and every 32 in, two tiers on double-hang, one under every linen shelf. A 6-ft single + 4-ft double + 3-ft linen closet takes 14 ft of rod, 22 ft of shelf, and 22 supports - the middle bracket is what keeps a loaded 6-ft rod from smiling. Flags runs longer than stock (splice lands AT a support).

Formula or tablerod = single + 2 x double; shelf = single + double + linen x count; supports per run = ceil(run/spacing) + 1 (two tiers on double-hang, one per linen shelf); sticks/boards = ceil(LF/stock); a run longer than stock flags a splice-at-support.

Source and editionCloset takeoff arithmetic - no standard claimed; hang heights are named as common practice, not code.

Free accessCounting arithmetic; shelving manufacturers publish span and support instructions free.

What governsEstimate. AHJ and licensed professional govern.

API field namessingle_hang_ft, double_hang_ft, linen_wall_ft, linen_shelf_count, bracket_spacing_in, stock_length_ft, rod_lf, shelf_lf, rod_sticks, shelf_boards, brackets