Internal Vibrator Spacing (ACI 309)

Spaces the internal-vibrator insertions that consolidate fresh concrete (ACI 309).

Run the calculator

Example

You enter

You get

No published worked example is on file for this calculation. It is checked against a hand-worked derivation of its method and an independent reference test.

Details, formula, and sources

Scopemax spacing = 1.5 x radius of action; edge distance <= 0.75 R; insertions = ceil(lift length x 12 / spacing). A 12 in radius head spaces at 18 in, stays within 9 in of the form, and a 20 ft lift takes 14 stabs; a smaller head with an 8 in radius of action tightens to 12 in and 20 stabs. The head's radius of action, not the wall, sets the count. ACI 309 governs.

Formula or tablemax_spacing_in = 1.5 x radius_of_action_in; edge_max_in = 0.75 x radius_of_action_in; insertions = ceil(lift_length_ft x 12 / max_spacing_in).

Source and editionACI 309 internal-vibration spacing rule by name (spacing = 1.5 R; edge <= 0.75 R); first-principles count arithmetic.

Free accessThe 1.5 R / 0.75 R spacing rule is public ACI 309 guidance; the radius of action comes from the vibrator manufacturer.

What governsEstimate. AHJ and licensed professional govern.

API field namesradius_of_action_in, lift_length_ft, max_spacing_in, edge_max_in, insertions

Related tools