Roof Drip Edge Rake / Eave Split and Piece Count

roofing-squares returns drip edge as a bare passthrough of the perimeter, which hides the thing that matters.

Run the calculator

Example

You enter

You get

No published worked example is on file for this calculation. It is checked against a hand-worked derivation of its method.

Details, formula, and sources

ScopeRAKES run up the slope and eaves do not. Measured off the plan, a 6:12 rake under-orders by 12% - four 14-ft rakes are 62.6 ft of metal, not 56. They are also different profiles installed opposite ways (eave under the underlayment, rake over), so they are counted separately, and pieces are figured on the stock length minus the lap.

Formula or tableslope factor = sqrt(1 + (rise/12)^2); rake LF = rake count x plan run x slope factor; eave LF = plan eave length; pieces = ceil(LF x (1 + waste) / (stock - lap/12)).

Source and editionRoof takeoff geometry - no standard claimed; the eave-under / rake-over installation convention is manufacturer installation guidance.

Free accessGeometry; drip-edge installation direction is published in every manufacturer's instructions.

What governsEstimate. AHJ and licensed professional govern.

API field nameseave_length_ft, rake_run_ft, rake_count, pitch_rise_per_12, stock_length_ft, lap_in, waste_pct, slope_factor, eave_lf, rake_lf, rake_slope_gain_lf, total_lf, effective_piece_ft, pieces

Related tools