Drying Completion Projection (Days to Goal)
Projects how many days a material needs to reach its dry goal from the moisture-content drop observed between readings: the remaining points to goal and a constant-rate days-to-goal estimate, or a not-progressing flag when the daily drop stalls. Turns the drying log into a schedule. Drying is non-linear and slows near the goal; the drying-log readings and IICRC S500 govern the real pull date.
Formula and source
remaining_pts = current_mc_pct - goal_mc_pct; days_to_goal = remaining_pts / daily_drop_pct (constant-rate, optimistic near goal). A non-positive daily drop reports 'not progressing' rather than dividing.
Linear-trend completion projection, by name; ANSI/IICRC S500. The constant-rate projection is a field-arithmetic identity, not edition-bound.
Audience
This tile is built for restoration and the adjacent professions in the Water Damage and Mold Restoration group. The interactive calculator runs entirely in your browser. No account, no fee, no advertising, no tracking.
Related tools
Posture
Rough Logic answers the math question the working professional asks on the job. The site is a calm, fast, ad-free, account-free, ever-free reference. It does not interpret code. It does not replace the licensed professional. It does not store your inputs. The Authority Having Jurisdiction governs all installations and inspections.