Opaque-Envelope Conduction Cooling Load (Sol-Air CLTD)

The conduction cooling load through a sunlit wall or roof: U x area x the sol-air CLTD, which for a dark roof in summer can run 70 F or more against a 95 F design day because the sun heats the surface well above the air. Dropping the surface's solar absorptance with a reflective cool-roof membrane cuts the load far more than the air temperature would suggest - the entire case for a cool roof in one comparison. The U-factor is the whole-assembly value; the CLTD is from the ASHRAE/ACCA table. One Manual J component, not the stamped load sheet.

Run the calculator

Formula and source

q_cond = u_factor x area_ft2 x cltd_f.

ASHRAE / ACCA Manual J opaque-envelope cooling load (Q = U x A x CLTD, the CLTD being the sol-air cooling-load temperature difference), by name; the relation is public.

Audience

This tile is built for hvac and the adjacent professions in the HVAC group. The interactive calculator runs entirely in your browser. No account, no fee, no advertising, no tracking.

Related tools

Posture

Rough Logic answers the math question the working professional asks on the job. The site is a calm, fast, ad-free, account-free, ever-free reference. It does not interpret code. It does not replace the licensed professional. It does not store your inputs. The Authority Having Jurisdiction governs all installations and inspections.