Also in: Disaster Response and Recovery

Excavation Slope and Bench-Step Plan

OSHA Appendix B slope ratios A 0.75:1 / B 1:1 / C 1.5:1 turned into spoil volume (yd^3), surface footprint.

Run the calculator

Example

You enter

You get

Checked against published worked examples from: OSHA.

Details, formula, and sources

ScopeOSHA Appendix B slope ratios A 0.75:1 / B 1:1 / C 1.5:1 turned into spoil volume (yd^3), surface footprint, and bench-step layout. Competent person on-site governs the final plan.

Formula or tablehorizontal_offset = depth * ratio (A 0.75 / B 1.0 / C 1.5). top_width = bottom_width + 2 * offset. cross_section = (top + bottom) / 2 * depth. volume_yd3 = cross_section * length / 27. Bench layout (A/B): 4 ft per bench; horizontal_step = bench_height * ratio.

Source and editionOSHA 29 CFR 1926 Subpart P Appendix B and §1926.652.

Free accessecfr.gov.

What governsMath aid for personal verification. Stop work and consult the qualified person on site if any number does not match the field condition.

API field namesdepth_ft, soil_class, surcharge, length_ft, bottom_width_ft, top_width_ft, spoil_volume_yd3, footprint_ft2

Related tools