Jobsite Material Stacking Limits (OSHA 1926.250)

Three stacking rules sharing one idea and one trap.

Run the calculator

Example

You enter

You get

Checked against published worked examples from: Occupational Safety and Health Administration.

Details, formula, and sources

ScopeThe idea: past a threshold a stack must lean AWAY, because a vertical face of loose units topples toward whoever is standing at it -- the person unstacking, at the moment they have removed what held the face. The trap: the threshold and the ceiling are DIFFERENT numbers, so a stack can be legal in height and illegal in shape. A 5 ft brick stack is nowhere near the 7 ft limit and already owes 2 in of taper. Brick: 7 ft max, 2 in per foot above 4. Block: half a block per tier above 6 ft -- an 8 ft stack of 8 in block owes 24 in. Lumber: 20 ft, but 16 if handled MANUALLY, so the same pile is legal or not depending on how it comes DOWN, not how it went up.

Formula or tablebrick: ceiling 7 ft, taper = (height - 4 ft) x 2 in per foot above the 4 ft level; masonry block: tiers above 6 ft = ceil((height - 6 ft) x 12 / block height), taper = tiers x half the block length; lumber: ceiling 20 ft, or 16 ft where handled manually.

Source and editionOSHA 29 CFR 1926.250, a US federal regulation in the public domain, quoted directly.

Free access29 CFR is published in full at no cost by OSHA and the eCFR.

What governsEstimate. AHJ and licensed professional govern.

API field namesmaterial, stack_height_ft, block_height_in, block_length_in, handled_manually, max_height_ft, taper_required_in, taper_shortfall_in, height_over_ft

Related tools