Concrete per Post Hole

The concrete a batch of post holes needs.

Run the calculator

Example

You enter

You get

No published worked example is on file for this calculation. It is checked against a hand-worked derivation of its method and an independent reference test.

Details, formula, and sources

ScopeThe cylinder volume of each hole less the post's displacement, totaled and divided into bags. For a fence, deck, sign, or mailbox.

Formula or tablePer hole = pi x (dia/2)^2 x depth / 1728 - post_side^2 x depth / 1728; total = per hole x posts; bags = ceil(total cu ft / bag yield).

Source and editionCylinder-volume geometry less post displacement; bagged-concrete yields ~0.45 cu ft (60-lb) / 0.60 cu ft (80-lb).

Free accessBag yields free on the concrete-bag label.

What governsEstimate. AHJ and licensed professional govern.

API field namesnum_posts, hole_diameter_in, hole_depth_in, post_side_in, bag_yield_cuft, concrete_each_cuft, total_cuft, bags

Related tools