Shotcrete / Gunite Order Quantity with Rebound

Cubic yards of shotcrete or gunite to order once rebound (the fraction that bounces off and never stays) is grossed up: shot = in-place / (1 - rebound). A 500 sf face at 4 in holds 6.17 cy but needs 7.72 cy shot at 20% rebound, 8.82 cy at 30%. The applicator's field rebound governs.

Run the calculator

Formula and source

in_place_cy = area_sf x (thickness_in/12) / 27; shot_cy = in_place_cy / (1 - rebound_pct/100); rebound_cy = shot_cy - in_place_cy.

Rebound gross-up identity by name (ACI 506 shotcrete practice); first-principles volume arithmetic.

Audience

This tile is built for trades and the adjacent professions in the Carpentry and Construction group. The interactive calculator runs entirely in your browser. No account, no fee, no advertising, no tracking.

Related tools

Posture

Rough Logic answers the math question the working professional asks on the job. The site is a calm, fast, ad-free, account-free, ever-free reference. It does not interpret code. It does not replace the licensed professional. It does not store your inputs. The Authority Having Jurisdiction governs all installations and inspections.