Soil Swell / Shrinkage Volume Conversion

Convert bank cubic yards to loose (truck) and compacted (placed) volume.

Run the calculator

Example

You enter

You get

Checked against published worked examples from: Caterpillar Performance Handbook soil-conversion method.

Details, formula, and sources

ScopeConvert bank (in-place) cubic yards to loose (truck) and compacted (placed) volume with the load factor and the borrow shortfall. The geotech report governs the percentages.

Formula or tableloose = bank x (1 + swell/100); load_factor = 1/(1 + swell/100); compacted = bank x (1 - shrink/100); fill_shortage = bank - compacted.

Source and editionCaterpillar Performance Handbook soil-conversion method (swell / shrinkage / load factor) by name; first-principles volume conversion.

Free accessThe swell / shrinkage / load-factor concept is published earthmoving practice. The percentages come from the geotech report or a published soil table.

What governsEstimate. AHJ and licensed professional govern.

API field namesbank_cy, swell_pct, shrink_pct, loose_cy, load_factor, compacted_cy

Related tools