Tandem (Two-Crane) Lift Load Share

Each crane's share of a tandem lift from the CG, the derated allowable per crane, and a combined pass / fail.

Run the calculator

Example

You enter

You get

Checked against published worked examples from: ASME B30.5 / OSHA 1926 Subpart CC.

Details, formula, and sources

ScopeA designated lift director and an engineered plan govern.

Formula or tableshare_c1 = W x (span - cg) / span; share_c2 = W x cg / span; allow = net_chart x derate / 100; pass when each share <= its derated allowable.

Source and editionASME B30.5 and OSHA 1926 Subpart CC by name; the cg-load-share statics plus a per-crane tandem derate.

Free accessOSHA 1926 Subpart CC is free at osha.gov; ASME B30.5 is a consensus standard. The capacities come from each crane's load chart.

What governsEstimate. Head rigger and manufacturer working-load-limit charts govern. Inspect every piece of hardware before the show.

API field namestotal_weight_lb, span_in, cg_from_c1_in, derate_pct, c1_chart_lb, c2_chart_lb, share_c1, share_c2, allow_c1, allow_c2

Related tools