Counterweight Fly System Balance

Required arbor counterweight, out-of-weight amount.

Run the calculator

Example

You enter

You get

Checked against published worked examples from: Theatrical counterweight rigging (single / double purchase).

Details, formula, and sources

ScopeRequired arbor counterweight, out-of-weight amount, and bricks to add or remove to balance a batten (required = (batten + load) x purchase_ratio). A double-purchase arbor needs twice the counterweight; an out-of-weight batten is the classic fly-rail hazard.

Formula or tablerequired = (batten_weight + attached_load) x purchase_ratio (1 single, 2 double); out_of_weight = required - existing; bricks = the whole count nearest |out_of_weight| / brick_weight, with the weight left over reported.

Source and editionTheatrical counterweight rigging (single / double purchase), by name.

Free accessStandard stagecraft counterweight-balance relation; the venue rigging inspection and the AHJ govern.

What governsEstimate. AHJ and licensed professional govern.

API field namesbatten_weight_lb, attached_load_lb, purchase_type, brick_weight_lb, existing_cw_lb, required_cw_lb, out_of_weight_lb, bricks

Related tools