Fuse >= 1.56 x Isc, rounded up to a 240.6(A) standard rating and checked against the module label maximum; fuses required with 3+ paralleled strings. Isc 10 A -> a 20 A fuse; a 25 A requirement on a 20 A module max is non-compliant. The NEC and AHJ govern.

req = 1.56 x Isc (1.25 x 1.25); fuse = smallest NEC 240.6(A) standard rating >= req; compliant if fuse <= module max; fuses required when >= 3 paralleled source circuits.

NEC 690.9 (PV source-circuit overcurrent protection) and 240.6(A) standard ratings, by name.

NEC 690.9 and 240.6 are in NFPA 70; many jurisdictions publish the code free to read. The NEC and the AHJ govern.

Estimate. AHJ and licensed professional govern.

Field names used by the API: Isc_A, max_fuse_A, n_strings, req_A, fuse_A