Rack Upright Frame Capacity and Unbraced Length

Compares frame load against its rating and shows the Euler buckling load at the entered beam spacing beside the load...

Run the calculator

Example

You enter

You get

Checked against published worked examples from: Michigan State University (A. Varma, CE 405 Design of Steel Structures).

Details, formula, and sources

ScopeCompares frame load against its rating and shows the Euler buckling load at the entered beam spacing beside the load with one level removed. Doubling the unbraced length quarters the capacity with nothing visible changing. ANSI MH16.1 requires tested capacities, and damage is repaired or replaced rather than derated.

Formula or tableP_cr = pi^2 E I / (K L)^2 with E = 29,000,000 psi over the unbraced length set by the beam spacing; load per column = loaded levels x load per level / 2.

Source and editionANSI MH16.1 Design, Testing and Utilization of Industrial Steel Storage Racks, which requires TESTED capacities for perforated cold-formed columns and requires damaged members be unloaded and repaired or replaced.

Free accessThe Euler relation is public; ANSI MH16.1 itself is a purchased standard.

What governsEstimate. AHJ and licensed professional govern.

API field namesbeam_spacing_in, column_moment_of_inertia_in4, effective_length_factor, loaded_levels, load_per_level_lb, rated_frame_capacity_lb, load_per_column_lb, load_per_frame_lb, utilization_pct, euler_capacity_lb, euler_capacity_level_removed_lb, removed_capacity_loss_pct

Related tools