Rack Upright Frame Capacity and Unbraced Length

Compares frame load against its rating and shows the Euler buckling load at the entered beam spacing beside the load...

Run the calculator

Example

You enter

You get

Details, formula, and sources

Compares frame load against its rating and shows the Euler buckling load at the entered beam spacing beside the load with one level removed. Doubling the unbraced length quarters the capacity with nothing visible changing. ANSI MH16.1 requires tested capacities, and damage is repaired or replaced rather than derated.

P_cr = pi^2 E I / (K L)^2 with E = 29,000,000 psi over the unbraced length set by the beam spacing; load per column = loaded levels x load per level / 2.

ANSI MH16.1 Design, Testing and Utilization of Industrial Steel Storage Racks, which requires TESTED capacities for perforated cold-formed columns and requires damaged members be unloaded and repaired or replaced.

The Euler relation is public; ANSI MH16.1 itself is a purchased standard.

Estimate. AHJ and licensed professional govern.

Field names used by the API: beam_spacing_in, column_moment_of_inertia_in4, effective_length_factor, loaded_levels, load_per_level_lb, rated_frame_capacity_lb, load_per_column_lb, load_per_frame_lb, utilization_pct, euler_capacity_lb, euler_capacity_level_removed_lb, removed_capacity_loss_pct

Related tools