Fire-Alarm / Security Standby Battery

Required battery amp-hours from standby and alarm loads times the aging correction (1.25 per NFPA 72-2022).

Run the calculator

Example

You enter

You get

Checked against published worked examples from: NFPA 72 §10.6 (by name).

Details, formula, and sources

ScopeWith the next standard size (NFPA 72 §10.6).

Formula or tableAh = [(I_standby * h_standby) + (I_alarm * h_alarm)] * derate, with the alarm minutes converted to hours; the next standard battery size is the smallest at or above the requirement.

Source and editionSecondary (standby) battery sizing for a fire-alarm or security control unit - standby amp-hours plus alarm amp-hours times the aging/derate factor - per NFPA 72 National Fire Alarm and Signaling Code §10.6 (secondary power supply) and the panel manufacturer's battery-calculation worksheet, by name.

Free accessFirst-principles amp-hour accounting. The AHJ-adopted NFPA 72 edition, the listed panel, and the battery manufacturer's derating govern.

What governsEstimate. AHJ and licensed fire protection engineer govern.

API field namesstandby_current_a, standby_hours, alarm_current_a, alarm_minutes, derate, required_ah, next_standard_ah