Vacuum Excavation Spoil, Swell, and Tank Fills

The individual pothole is small and the day's total is not.

Run the calculator

Example

You enter

You get

Details, formula, and sources

The individual pothole is small and the day's total is not, and swell is what fills the tank sooner than the arithmetic suggests. Soil excavated from a compacted bank occupies twenty to forty percent more volume loose, and a wet vacuum adds the water used to cut, so the material going into the tank can be well over half again the in-place volume. Planning on bank volume produces a schedule that is optimistic by exactly that margin. A single 8 by 4 ft test pit to 5 ft is 5.93 cubic yards in the bank and 7.70 loose at 30% swell -- 64% OF A TWELVE YARD TANK from one pit. A day of potholing a corridor is thirty keyholes plus the test pits, and the tank fills in the middle of the afternoon a long way from the dump site. DISPOSAL IS THE VARIABLE THAT CHANGES THE NUMBER MOST. Spoil that can go back in the hole is a short cycle; spoil that must be hauled because it is slurry, because it is contaminated, or because the jurisdiction does not permit returning it, is a haul cycle per tank and a completely different day -- which is why the haul time is reported against the fill count rather than left implicit, and why the fills are computed both with and without swell so the difference is visible rather than discovered. Volume arithmetic on prismatic pits. It does not evaluate whether spoil may be returned to the excavation or must be hauled, which is a jurisdictional and contamination question, and it does not address the classification, containment, or disposal of slurry, which in many places is a regulated waste stream. It does not size the vacuum unit, address water supply and pressure for wet cutting, or evaluate the soil's suitability for vacuum excavation. It does not replace exposing a utility as the way to establish its position, nor the one-call notification that must precede any of it. The utility owner, the one-call system, the applicable damage prevention law, and the disposal jurisdiction govern.

bank volume = length x width x depth / 27; loose volume = bank x (1 + swell) plus any water added at 7.48052 gallons per cubic foot; tank fills = loose volume / tank capacity, rounded up.

Prismatic volume with an entered swell factor (commonly 20 to 40%) and the water added for wet cutting, by name. The disposal jurisdiction, the utility owner, the one-call system, and the applicable damage prevention law govern.

Volume arithmetic on the user's own pit dimensions and swell figure; no regulatory waste classification is reproduced.

Estimate. AHJ and licensed professional govern.

Field names used by the API: pit_length_ft, pit_width_ft, pit_depth_ft, pit_count, swell_pct, water_added_gal, tank_capacity_cy, haul_round_trip_min, bank_cy_each, loose_cy_total, tank_fills, first_pit_tank_pct, haul_time_min