Overflow Scupper Sizing (Weir Flow)

Secondary (overflow) scupper as a rectangular weir.

Run the calculator

Example

You enter

You get

Checked against published worked examples from: North Carolina Building Code Council (International Code Council base text).

Details, formula, and sources

ScopeQ = 3.33 L H^1.5 (cfs, feet), contracted 3.33(L - 0.2H)H^1.5. A 6 in scupper at 3.5 in head passes 104 gpm on the contracted form the IPC sizing figure uses (118 only if the opening spans the full channel width); a wide 12 in / 2 in scupper passes 98 gpm. Head is measured 6 ft back from the opening at the blocked-primary condition (IPC 1108 / FM Global). The code and roof-loading check govern.

Formula or tableQ = 3.33 L H^1.5 (cfs, L and H in ft); contracted Q = 3.33 (L - 0.2 H) H^1.5; gpm = cfs x 448.83.

Source and editionThe rectangular (Francis) weir capacity of an overflow scupper, secondary roof drainage per IPC 1108 / FM Global, by name. The IPC's scupper sizing figure (Figure 1106.5 in the 2015 IPC, as adopted in the 2018 NC Plumbing Code) prints the contracted form Q = 3.33 (L - 0.2 H) H^1.5 with H measured 6 ft back from the opening; the suppressed value is the full-channel-width case.

Free accessThe Francis rectangular-weir formula is public; the secondary-drainage requirement is in the published IPC (Section 1108) and FM Global data sheets.

What governsEstimate. AHJ and licensed professional govern.

API field nameslength_in, head_in, q_gpm, q_gpm_contracted